Client:
First Centre West Buses
Project:
Willesden Junction Depot
The Brief:
To provide drainage, hardstanding and lighting at the Willesden Junction site, a disused railway goods depot with a quick turnaround.
The Team:
A large Quantity Surveying practice, a Mechanical/Electrical Engineering Consultant as well as the CDM co-ordinator and the Garage Management Team. The project was to be administered by a consultant engineer from First Group, the client’s parent company.
Specific challenges:
- It was to be ‘business as usual’ for the site during the works, which meant full access for large vehicles at all times.
- A considerable amount of spoil had to be removed and certified hardcore and concrete brought onto site.
- Additional works were added to the scheme during the process.
The Result:
The project was completed in advance of the completion date, within the client’s budget and to their satisfaction.
Projects
Belfry Clients
Download our Brochure
Click here to download our brochure
Contact Us
| Email: | team@belfrybuild.com |
| Telephone: | 01268 494 090 |
| Address: | Anglia House, Stannetts Basildon, Essex SS15 6DN |